BBG has operated the Bilbao LNG regasification terminal since 2003, with 450,000 m³ storage capacity and a loading bay for LNG tanker trucks supplying satellite plants, industrial sites, and other terminals.
OUR WORK
Montrel was awarded the design, supply, and implementation of the cryogenic loading skid, as well as the management and control software for full automation. The system enables operation through articulated arms on a prefabricated skid, a pioneering solution in Spain at the time.
The project, part of an EPC contract involving Initec, Sofregaz, and Tecnigaz, also included the development of administrative documentation for operators and real-time remote maintenance from Montrel’s offices.
Ponte en contacto con nosotros
